The bill of quantities (BOQ): how to compare quotes fairly
What a bill of quantities is, how it is built from drawings, units and item descriptions, and how it makes quotes comparable and payments clear.
Arkan Almajara team · · 2 min read
The short answer
A bill of quantities lists every item of work: its description, unit (m², linear metre or number), quantity and named material. When every contractor prices the same bill, quotes become comparable, and the bill becomes the basis for tracking progress, payments and changes.
- Without one shared BOQ, each contractor prices something different.
- Descriptions must name the material, system and finish level.
- Correct units: m² for surfaces, linear metres for edges and bulkheads, number for items.
- A BOQ tied to the drawings makes any later change easy to price.
Two quotes for one project, one clearly cheaper. Before choosing, ask: did they price the same thing? The bill of quantities answers that.
What it contains
| Column | Example |
|---|---|
| Item number | 2.04 |
| Description | Suspended gypsum board ceiling, 12.5 mm moisture-resistant board, galvanised frame, level 4 jointing |
| Unit | m² |
| Quantity | 42 |
| Unit rate | Filled in by the contractor |
| Total | Quantity × rate |
The right units
- m²: flat ceilings, walls, cladding and paint.
- Linear metre: bulkheads, light coves, cornices, shadow gaps and skirtings.
- Number: access panels, downlights, drivers and doors.
- Lump sum: small, clear items that are hard to measure.
Description is everything
“Gypsum ceiling” alone allows any board, any frame and any finish. A good description names:
- The material, its type and thickness.
- The system (frame and spacing).
- The finish level.
- What the item includes and excludes.
How to compare quotes
- Send the same bill to every contractor.
- Ask for every item to be priced, not just a total.
- Compare item by item: a big difference on one item means a different understanding or an error.
- Ask for proposed alternatives to be stated openly, not substituted silently.
During the works
The bill is the basis for interim payments (paid by work completed) and for variation orders. Read the fit-out programme.
Estimate some quantities yourself with the finishing calculators. Read shop drawings and what decides the cost of a gypsum ceiling. The service: shop drawings and bills of quantities.
Frequently asked questions
Who prepares the BOQ?
Usually the designer or a quantity surveyor, from the shop drawings. With nqrah design it is taken from the same approved model and drawings.
Are the quantities in the BOQ binding?
In remeasurement contracts, the quantity actually built is paid. In lump-sum contracts, the BOQ quantity stands. The contract decides.