What owners should know about fire requirements for commercial finishes: material classification, rated walls and ceilings, penetrations, escape routes and civil defence.

Arkan Almajara team · · 2 min read

Illustrative photo Moisture-resistant gypsum boards after installation

The short answer

In commercial projects, finishes are subject to fire requirements: classification of wall, ceiling and escape-route materials, rated walls and ceilings with a set duration, penetrations sealed with rated materials, and exits, signs and sprinklers left unobstructed. The local code and civil defence set the requirements, which are checked before materials are chosen.

  • Escape routes usually require higher-classified materials than rooms.
  • Rated walls and ceilings are built to a tested system.
  • Services crossing rated walls are sealed with rated materials.
  • Never cover sprinklers, detectors, signs or exits with finishes.

Beautiful décor in a restaurant, shop or hotel must be safe first. Finishes affect how fast fire and smoke spread and how easily people get out.

What the requirements usually cover

Area Examples
Material classification How a material behaves in fire: ignition, flame spread, smoke
Rated elements Walls, ceilings and doors with a set fire resistance
Penetrations Collars, intumescent materials and duct dampers
Escape routes Higher-classified materials, set widths, lit signs
Protection systems Sprinklers, detectors and alarms, unobstructed

The reference is the local code and civil defence requirements for the type of building, not a general rule.

In the finishes

  • Suspended ceilings: coordinated with sprinklers and detectors; access panels in rated ceilings are rated.
  • Cladding: the product’s classification is checked for its location, especially in corridors and exits.
  • Rated walls: to a tested system. Read fire-rated gypsum.
  • Fabrics and curtains: treated or classified where required.

Coordination

  1. Receive the approved fire drawings before detailed design.
  2. Choose materials with certificates that meet the requirements.
  3. Build to match, and photograph what will be covered.
  4. A handover file with the materials and their certificates.

Common mistakes

  • Cladding a wall in an escape route with an unsuitable material because it looks better.
  • Closing a ceiling over a sprinkler or hiding a detector behind décor.
  • A service penetration in a rated wall sealed with ordinary filler.

Read partitions and ceilings in hospitals. The service: commercial fit-out.

Frequently asked questions

Are wood and marble alternatives allowed in shops?

It depends on the product's classification, its location and the code. Some products come with improved fire classifications. We check the product certificates against the requirements before approval.

Who approves the fire drawings?

The civil defence authority under its procedures, after the drawings are submitted by a qualified party. We build to the approved drawings.

Share

Related service

Need this on your project?

Restaurants, hotels, clinics, shops and offices, from frame and partitions to cladding and light, with one contractor.

Entrance lobby with timber cladding, marble walls and a multi-level gypsum ceiling
12

Commercial interior fit-out

Restaurants, hotels, clinics, shops and offices, from frame and partitions to cladding and light, with one contractor.

Details

Have a space or a drawing? Start with a site visit.