Material boards and finish schedules: making sure everything works together

What material boards and finish schedules are, how real samples are brought together, and why they are approved under the space's actual light.

Arkan Almajara team · · 2 min read

Illustrative photo Design studio with boards and models

The short answer

A material board brings real samples for each room together, so you see how marble, timber, paint and fabric work together under real light. The finish schedule turns what was approved into a formal list: for each surface in each room, its material, colour, code and supplier.

  • The screen gets close; the real sample decides.
  • Show samples together and in real proportion: floors large, details small.
  • Check under the space's actual lighting, by day and night.
  • A finish schedule prevents silent substitutions on site.

Beautiful marble, warm timber, calm paint: each is lovely on its own. But do they work together? You do not know until you see them side by side.

The material board

One board per room or zone, bringing together:

  • A floor sample of reasonable size.
  • Wall samples: paint, marble alternative or wood alternative.
  • The ceiling colour.
  • Fabrics: curtains, sofas and rugs.
  • Metals: handles, frames and light fittings.

How to read it

  • In proportion: floors and walls are large areas, so their samples are larger than the details.
  • Under the space’s light: by the window by day, under the planned lighting at night. Read colour temperature.
  • With the visualisation: the image for composition, the sample for true colour.

The finish schedule

Room Surface Material Colour/code Supplier Notes
Living room Main wall SPC marble alternative Supplier code — Book-matched
Living room Other walls Washable paint Colour code — Eggshell
Living room Ceiling Gypsum + matt paint Warm white — Finish level 5

This schedule is part of the deliverables with nqrah design, handed over with the bill of quantities and the FF&E list.

Why it matters on site

Without a schedule, “a close colour” replaces the approved one and “a similar model” replaces the model. A written schedule makes every substitution an open decision that must be approved.

Read the design approval process. The service: interior design.

Frequently asked questions

Is a material board needed when there is 3D visualisation?

Yes. The visualisation shows composition and lighting; the sample shows the true colour, texture and sheen. Together they give the most precise decision.

What if an approved product is discontinued?

The alternative is shown as a sample and approved in writing before use, and the finish schedule is updated.

Share

Related service

Need this on your project?

Interior design and photo-real 3D images in day, dusk and night light, with nqrah design, before any work on site.

3D visualisation of a reception hall: lit gypsum ceilings, book-matched marble panels and a banded marble floor
09

Interior design and 3D visualisation

Interior design and photo-real 3D images in day, dusk and night light, with nqrah design, before any work on site.