Finishing building entrances and lift lobbies: materials for daily wear
How residential and commercial building entrances and lift lobbies are finished: hard-wearing materials, ceiling and lighting, flooring, and working in an occupied building.
Arkan Almajara team · · 2 min read
The short answer
Everyone passes through a building entrance every day, so it needs materials that take wear and cleaning, and a design that makes a strong first impression. The common combination: marble- and wood-alternative wall cladding, a multi-level gypsum ceiling with concealed lighting, and phased work that keeps the entrance in use.
- Walls up to hand height need materials that take knocks and cleaning.
- A two-level ceiling with concealed light lifts an entrance without the cost of stone.
- Plan mailboxes, cameras and signs before cladding.
- Phased work keeps residents moving and safe.
The entrance is the building’s face on the inside: the first thing a visitor sees, and the place residents pass dozens of times a day. It must look good on its first day and five years later.
Materials by zone
| Zone | What suits it |
|---|---|
| Walls up to hand height | Marble alternative, stone panels or wood alternative: they take wear and wiping |
| Upper walls | Painted gypsum, or the cladding continued |
| Around the lift | Book-matched marble alternative, or a metal frame |
| Ceiling | Gypsum board in two levels with concealed light |
| Floor | Slip-resistant marble or porcelain |
Design
- One focal point: a main wall with book-matched panels or lit slats, the rest calm.
- Ceiling: two levels with concealed light give depth and height.
- Lighting: warm and comfortable, with no harsh shadows on faces at the cameras.
At a building entrance we built: a two-level ceiling with concealed light over the lift and stair, a wall of wood-alternative slats, a book-matched marble-alternative panel at its centre, and a marble medallion in the floor.
Coordinate before cladding
Mailboxes, intercom, security cameras, wayfinding and emergency signs, and sockets. Every hole after cladding costs a panel.
Working in an occupied building
- A safe, defined route at all times.
- Noisy work at agreed hours.
- Protection for the lift and floors.
- Daily cleaning and waste removal.
- A notice with the duration and stages.
Read book-matching and the wood alternative guide. The service: marble alternative.
Frequently asked questions
Can the entrance be renovated while residents use it?
Yes, by phasing the work, keeping a safe route, working at quieter times and cleaning daily.
What is the best floor for an entrance?
A hard, slip-resistant material that takes wear, such as marble or porcelain with a suitable finish. Wall panels are not used on floors.