Fitting out a leased unit in a mall or commercial building: landlord and tenant rules

What to know before fitting out a leased shop or office: the landlord's handover condition, the tenant guide, approvals, working hours, insurance, and reinstatement.

Arkan Almajara team · · 2 min read

During works Ceiling suspension grid and wall frames before boarding, cables in place

The short answer

Fitting out a leased unit follows the landlord's rules: the handover condition (shell or partly fitted), a tenant guide that sets frontage, services and materials, approval of drawings before starting, working hours and insurance, and exit terms. Reading them early saves weeks.

  • Know the handover condition precisely: what the landlord provides and what falls to you.
  • The tenant guide sets the frontage, sign, services and permitted materials.
  • Drawings need building management approval before starting.
  • Work is usually at night, behind a hoarding, with permits.

In a mall or office tower, you do not fit out your unit alone: there is a landlord with rules, a management that approves drawings, and neighbours at work. Knowing the rules before design saves time and money.

Before design

Question Why
What is the handover condition? It sets your scope: ceiling? floor? AC?
What is in the tenant guide? Frontage, sign, heights, materials and systems
Where are the service connections? Power, water, drainage, AC, fire alarm
What are the fire requirements? Sprinklers, detectors and escape routes
What are the exit terms? Must the unit be reinstated?

Approvals

  1. Submit drawings (architectural, electrical, mechanical and fire) to management.
  2. Address their comments.
  3. A permit to start work.
  4. Inspections during and at the end of the works.

Read finishes and fire safety.

During the works

  • A temporary hoarding, sometimes to the mall’s design.
  • Noisy work usually outside trading hours.
  • Insurance and third-party liability.
  • Set delivery routes and times.
  • Clean shared corridors.

Read working in occupied spaces.

The programme

Opening is often tied to a rent-free period. Tie design, approvals and supply to it. Read the fit-out programme and retail fit-out.

The service: commercial fit-out.

Frequently asked questions

What does shell handover mean?

A unit with a concrete floor and walls and main services at the boundary; all finishing falls to the tenant. What it includes varies by building, so read the lease and tenant guide.

Must the unit be returned as it was on leaving?

That depends on the lease. Some require reinstatement to handover condition, which affects the choice of finishes from the start.

Share

Related service

Need this on your project?

Restaurants, hotels, clinics, shops and offices, from frame and partitions to cladding and light, with one contractor.

Entrance lobby with timber cladding, marble walls and a multi-level gypsum ceiling
12

Commercial interior fit-out

Restaurants, hotels, clinics, shops and offices, from frame and partitions to cladding and light, with one contractor.

Details

Have a space or a drawing? Start with a site visit.

Tell us the type of space and its approximate size, and we will get back to you to book a time.